Digitising food service operations
As the sole development team, 2C built a centralised stock and product-information platform for a global leader in food service.
Client
Global
8people
in the sole development team
2+years
working directly with the business
2platforms
for stock and product information
About Compass Group
Compass Group is a global leader in food service and support services. It operates in more than 30 countries and serves millions of meals a day across business, healthcare, education and leisure.
What needed solving
With a vast network of suppliers, kitchens and dining facilities, managing product information and stock by hand was no longer sustainable. Accurate data had to flow across every location to cut waste, keep inventory at the right level and stay compliant with health and safety rules.
The goal: centralise and standardise product data, track and forecast stock, reduce food waste with better rotation and alerts, and connect suppliers directly into procurement.
No middlemen, no layers. One focused team that understood the business.
What we built
2C was the sole development team on the project, working directly with Compass Group’s business team for more than two years. Alongside Neptune consultants, we drove the core development end to end.
We built a modular, role-based platform on Neptune Software and AWS, using microservices across separate client, system and business layers. External supplier databases are integrated directly, so product availability and specifications stay current, and each interface is designed for the people who use it every day - kitchen staff, procurement and logistics.
Stock Management App
Real-time visibility of inventory levels and stock movements, with alerts when items run low.
Product Information System
Up-to-date ingredient, allergen and nutritional data for every product, consistent across all operations.
What changed
A centralised, data-driven supply chain
Automated stock tracking and smarter procurement
Less food waste through better rotation and alerts
Allergen and nutrition compliance built in from day one
Other case studies
Digitising a steel manufacturing floor
A 2C team owned Phase 1 of a production system for a 300,000 sq ft steel plant: 70+ role-based apps running on desktop, mobile and Zebra scanners.
70+ role-based apps on the factory floor
From AI prototype to production
Two 2C engineers took over a 117,000-line AI-generated prototype and turned it into the platform a UK building services company runs on - live in six months.
6 months from takeover to go-live
A water management platform, built from scratch
A three-person 2C team designed and built the MVP of a B2B platform that replaced spreadsheets for water quality and compliance work across hundreds of sites.
100s of sites run on the platform
Building something similar?
Book a free 30-minute call. Tell us what you're building and we'll tell you how we'd approach it - no strings attached.